  • 2002
    Jiangxi QOCl Electric Co., Ltd.was formally established
    We-are-all-dream-chasers-----Enter-Jiangxi-QOCI-Electric-Co
  • 2003
    The industry's first to introduce military management and standardized operation engineering voltage level reached 500kV
    We-are-all-dream-chasers-----Enter-Jiangxi-QOCI-Electric-Co
  • 2004
    Successfully completed the 500kV line project and the 500kv Tongzhou substation project, a key Olympic Games project;Took the lead in launching service measures for equipment protection;
    4
  • 2005
    Participated in the construction of +500kV Jiangcheng line during the disaster relief period of the State Grid system;Strengthened professional management work and formed a basic structure of 6 departments, 13 functionaldepartments, 5 work areas and 1 workshop;
    2006 Completed the first batch of the Three Gorges line series projects (referred to as the 331 series projects) of the StateGrid;
    3
  • 2007
    We deepened military management, introduced new measures for standardized operations, and completed more than300 projects throughout the year:
    Packaging method6
  • 2008
    Completed the construction of the company's new structure (one headquarters, one ofice, two bases, and two overseas work areas);
    Contracted and successfully implemented high-voltage line projects (Nanjing 1000kv line project, Fufeng +800kv line project);
    Tempering-Machine
  • 2009
    Completed 247 engineering projects throughout the year.Obtained the "Quality, Environment, Occupational Health Management System Certification Undertaking (Repair, Test)Power Facilities License";Obtained RTV-| and RTV-ll type test reports in accordance with the new national standard.
    We-are-all-dream-chasers-----Enter-Jiangxi-QOCI-Electric-Co
  • 2010
    Overcoming difficulties, the company once again completed the historic 915 series project;It was rated as a national high-tech enterprise.
    Power-&-Renewable-Energy-Technology-Exhibition1
  • 2011
    Independently developed mobile dip coating workshop, the overall technology of the project has reached advancedlevel; obtained utility model patent certificates for composite dip coating device, dip coating production workshop andRTV dip coating equipment of insulator factory.
    Everything-you-need-to-know-about-high-voltage-glass-insulators
  • 2012
    We launched the "730 Project" to improve the level of "military management and standardized operations" and deepenmanagement details
    Automatic-Dosing-Equipment
  • 2015
    New insulator production line
    Jiangxi-QOCl-Electric-Co
  • 2019
    With the production capacity of ±1100KV line products 
    Participation in pilot - transfer of results of major national programs
    What-are-the-advantages-of-transparent-glass-insulators?3
  • 2023
    Jiangxi Province "5G Industrial Internet" application demonstration project
    Selected as Jiangxi Province manufacturing industry digital transformation outstanding case
    Curing-Equipment